Gorgon LNG Project
Fire & Gas Detection & Suppression Systems for the complete Camp, Operations & TCF including, Ex Telephone Systems, Junction Boxes, Security System CCTV & Access Control Interfaces, including design, assembly, documentation, FAT, SIT & SAT.
Stage 2: Design and supply of 134 fully networked Fire Alarm Panels, including the integration of twin graphics packages and over 7,000 field devices.